When Gary left, the place looked the Somme in WW1. So Nette and spent the next week raking, levelling and landscaping. Lots still to do, but the groundwork (!) is mostly done.
We also waterproofed a second old concrete tank (the twin of the one we moved) ready to be connected to the new shed. Our plumber, Phil, reckons we should stop collecting tanks now as we have enough in his humble opinion. He may be right - we have one 110,000 litre (full), and three 22,000 litre tanks (one is full and 2 have only just been connected).
And what a big difference it made getting the front doors on the shed! Many thanks to local company John Atterbury Doors. From the outside the shed almost looks finished now. Just gutters and some odd bits of flashing to go. Inside is a different story. The ceiling battens are up - which was a job and a half - ready for the ceiling, but that's about it. Good thing we're not in a hurry eh?
Almost art - ceiling battens |