Friday, January 31, 2014

The right tin to do

We've long liked the idea of a pressed tin ceiling for our bathroom and loo.  In fact, we had planned for it from the start, or at least we thought we had.  The hiccough we hadn't anticipated was the cost of freight - which brought the cost of materials to well over $1,500 before installation and finishing.  We really couldn't bring ourselves to spend that much and there didn't seem to be any viable second hand alternatives around.
 
We'd resigned ourselves to a garden variety plaster ceiling when I mentioned it to my brother.  Stagger me if it didn't turn out that he had a house worth of pressed tin that he had picked up 30 years ago from a demolition in our home town, Grenfell.  Not only did it have provenance (last century the owner had been my pre-school teacher) the price was right.  All he wanted was a set of white rear louvers for a 1956 FC Holden sedan.  How hard could that be?
 
With hindsight, the price was very much higher (and I still haven't found those louvers) .  Each sheet had three coats of enamel paint which needed removing along with 80 years of dust on the upper side.  All rust had to be treated, edges radiused and dents panel beaten.  Then followed an undercoat of red oxide primer and 3 top coats of white gloss.  Total time per sheet - don't even ask, but suffice to say that's two weeks of my life I won't get back!
Pressed tin in the bathroom
 
Installing it brought its own challenges, particularly for two vertically challenged builders like Jeanette and I.  But I have to say the end result is just what we were after.
 
We still have the cornice to go - I'm wondering about carving an egg and dart design into Tassie Oak. But I hope I talk myself out of it!
 
 

Monday, January 13, 2014

A concrete solution

It's not pretty - but it's finished!
Nette and I have finally discovered our dizzy limit – it’s one cubic meter of concrete.  The good news though is that we finally have a solid floor in the shed. 
 
It occurred to us early in the shed construction phase that with an area of 5m x 8m to lay the two of us were going to struggle to do it in one pour. So, with our second hand electric cement mixer, a couple of shovels, over 50 bags of cement, blue metal, sand and Rolex the watchdog to supervise we split the area into four and tackled it over several weekends.  We now know that with both us working virtually non-stop for 7 to 8 hours we can mix, pour and finish one cubic meter of concrete – and dare I say it - not a centimeter more.  
 
Step 1-build shed. Step 2-lay floor?
The result isn’t beautiful, but it’s finished.  

You may well be thinking that building the shed and then laying the concrete is the wrong way about – but it does have some advantages. Firstly, the shed walls help secure the formwork. Secondly, you are working under cover when mixing the concrete.  But most importantly, even we couldn’t get the size and position of the slab wrong. 
 
Next – the bathroom ceiling

Thursday, July 4, 2013

Even better still

Last October is best noted for the red letter day that marked history as pre and post-ISL (inside loo).  True, post-ISL saw a loo resplendent with walls and, most excitingly, a door and ceiling.  But it still required manual intervention of the type not usually associated with inside amenities. Namely, because there was no running water a flush could only be orchestrated by carefully upending a bucket into the bowl.  Effective, yes, but still not the full ISL experience for which we yearned.
 
But with fanfare and brightly coloured bunting I am proud to announce that ISL day has now been overtaken by an even more significant paradigm shifting, life changing occurrence – the first non bucket powered flush!
 
June 28 will now be remembered with reverence and hushed tones as FISL day (flushing inside loo).  Though perhaps I need to reconsider the acronym.
 
What has brokered this shift from 1 star to 1.5 star accommodation?  The installation of our 110,000 litre galvanised water tank and a gift from God, some 150mm of rain.  Next challenge? Well, hot water would be nice.

Sunday, May 12, 2013

Plumbing 101

A consistent design theme for the house has been to give the impression of an old place that’s been “modernised”. That’s why, for example, the electrical wiring runs through visible copper piping attached to the exposed beams. So when it came to the plumbing we wanted to continue the paradigm by making it look like running water had been added long after the house was built. 
 
The first plumber we spoke couldn’t get past that we wanted to see all the ugly pipes. But the second bloke, Phil, understood exactly where we were coming from. As a result, the loo wall is a work of art with a wonderful array of copper water pipes, bends and connections show.  Everything needed for the shower, basin and bath in the bathroom on the other side of the wall is on view when you spend a penny. 
 
After all, Phil’s workmanship is brilliant and far to good to be hidden in a wall.
 
Next job – a really big water tank.

Tuesday, January 29, 2013

The Master Returns

In 1996 my wife, Nette, our two girls, Sam (5yrs) and Georgii (3yrs) and I travelled to Gifford, Scotland.  The following 12 months was an adventure in a Scottish village with its small school, 200 year old church and arguably the best antique restoration and fine furniture making school in the world.
We had a ball learning a new language, Sam even won the local Robbie Burns poetry recital competition with her newly acquired near perfect Scottish lilt.  Nette picked up some groovy dance moves at her Scottish country dancing lessons and the local kindergarten named their class budgie after Georgii. As for me, I learnt about shellac and sharpening, mahogany and mortises, veneers, Victoriana and vices – to name just a few things.
Roll forward 16 years and the grand master of the school, Anselm Fraser, asks to visit our construction site near the South Coast.  Would he approve?  Would the student’s skills meet the teacher’s expectations?  Would the design, cabinetry,lead lighting and plain hard work be acceptable?
The answer was an emphatic “yes” as Anslem stepped from the car and declared, “now that’s a piece of furniture”.  What a wonderful lunch we shared as we reminisced about 1996, swapped notes about our local councils’ building regulations, and planned the next stages of our croft and Anselm’s next project, a straw bale castle.